|
141 |
Tender for the construction, completion and maintenace of the Negombo projecf
|
|
|
|
|
141 |
|
|
Not Available |
|
142 |
Hydraulic flume tests with investments and break waters
|
|
|
|
|
142 |
|
|
Not Available |
|
143 |
Sri Lanka specifications for coastal and harbour engineering works
|
|
|
|
|
143 |
|
|
Not Available |
|
144 |
Implementation of master plan for coast erison management test dredging at Negombo
|
|
|
|
|
144 |
|
|
Not Available |
|
145 |
Concept for coast erosion management for the coastal reach of paiyagala / SriLanka
|
|
|
|
|
145 |
|
|
Not Available |
|
146 |
Summary of interim report (i) for the study on the development of the port of Galle in the democratic socialist republic of SriLanka
|
|
|
|
|
146 |
|
|
Not Available |
|
147 |
Fourth Austrlian conference on coastal and ocean Engineering
|
|
|
|
|
147 |
|
|
Not Available |
|
148 |
Sri Lanka master plan for coast erosion management agreement for engineering consultancy service. Between the coast conservation department
|
|
|
|
|
148 |
|
|
Not Available |
|
149 |
Coastal Engineering at Ove Arup and partners.
|
|
|
|
|
149 |
|
|
Not Available |
|
150 |
Tanker and bulk carrier terminals
|
|
|
|
|
150 |
|
|
Not Available |
|
151 |
Proposal on hydraulic flume tests with revetments and break waters June 1992
|
|
|
|
|
151 |
|
|
Not Available |
|
152 |
Inception report - finalization of technical assistance to CCD SriLanka June 1992
|
|
|
|
|
152 |
|
|
Not Available |
|
153 |
Implementation of master plan for coast erison management test dredging at Negombo
|
|
|
|
|
153 |
|
|
Not Available |
|
154 |
The present proposal out lines the scope of work necessary for the det norske veritas to perform certification services as port of the colombo harbour crude oil morning terminal and associated facilities pro
|
|
|
|
|
154 |
|
|
Not Available |
|
155 |
Hydraulic flume tests with revetments and break waters
|
|
|
|
|
155 |
|
|
Not Available |
|
156 |
Hydraulic flume tests with revetments and break waters
|
|
|
|
|
156 |
|
|
Not Available |
|
157 |
Port planning and port facility design
|
|
|
|
|
157 |
|
|
Not Available |
|
158 |
Consultancy services for the study of the canal and drainage system in colombo interim report
|
|
|
|
|
158 |
|
|
Not Available |
|
159 |
Moratuwa and Negombo projects
|
|
|
|
|
159 |
|
|
Not Available |
|
160 |
Report on coastal engineering investigation in the coastal reach kandakuliya . Jan 1995
|
|
|
|
|
160 |
|
|
Not Available |